Before you create corridors, you must have existing data, such as existing ground surfaces, alignments (centerlines), profiles (vertical alignments), and typical sections (assemblies).
|
Surfaces are used to derive alignments and profiles, and for corridor grading. | |
![]() |
||
|
Alignments are used by a corridor as its centerline. | |
![]() |
||
|
Use existing ground profiles and design finished grade profiles (vertical alignments). | |
![]() |
||
|
Calculate superelevation for the curves on the baseline alignment. | |
![]() |
||
|
Use subassemblies to build the required assemblies. | |
![]() |
||
![]() |
Before creating an assembly, identify the different types of subassemblies you need. | |
