Share

Updating a Single Out-of-Date Point Group

Product Documentation
Intermediate

Use the Prospector tab to update an out-of-date point group.

An out-of-date point group has next to it on the Prospector tab.

Note

Out-of-date icons are displayed only if the Toolspace tree modifier icon display is active. For more information, see Drawing Item Modifier Icons.

A point group is out-of-date when the points in the point list do not match the point group’s properties. For more information, see Out-of-Date Point Groups.

To update a single out-of-date point group

  1. In Toolspace, on the Prospector tab, right-click a point group that is out-of-date. Click Show Changes.

    The Point Group Changes dialog box displays a list of the changes required to bring the point group up to date.

    Tip

    If you do not want to review the changes required to bring the point group up to date, click Update on the context menu instead of Show Changes.

  2. Click to update the point group.
  3. Click OK.

Toolspace Context Menu

Prospector tab: right-click Point Groups item Show Changes

Dialog Box


Was this information helpful?