There are various ways you can edit corridor regions.
- move the region’s start or end stations
- add baselines
- set or edit assembly frequencies
- set or edit targets
- change a region assembly
- split a region into two regions
- merge two regions into one region
- copying corridor regions
- match the parameters of one region to other regions
- add regions
- isolate regions
- hide regions
- delete regions
Each of these tasks is covered in the Help topics that follow.
Topics in this section
- Editing Corridor Regions Using Grips
When you select a corridor region, triangular grips are displayed at the start and end stations of the region. Use these grips to manually change the start and end station for a region.
- Editing Corridor Region Targets
You can edit corridor region targets using the Edit Targets command in the Corridor ribbon tab.
- Splitting Corridor Regions
You can split a corridor region into two regions.
- Adding Stations to a Corridor Region
Add stations to a corridor region.