You can update an open drawing with the latest versions of all project objects and point data.
The Sync To Project command updates out-of-date drawings that reference project objects. It also updates any out-of-date project points contained in the drawing. The out-of-date condition can occur when someone checks in a project object’s source drawing or checks in project points.
Local copies of out-of-date source drawings and project points are replaced with the latest version from the project database.
- In Toolspace, on the Prospector tab, under the Open Drawings collection, right-click the drawing you want to synchronize.
- Click Sync To Project.
- In the Sync To Project dialog box, select the out-of-date project objects you want synchronized.
- Click OK.