Share

Copying Corridor Regions

Product Documentation
Intermediate

Use this command to copy corridor regions along the same baseline.

To copy a corridor region

  1. In the drawing, click a corridor.
  2. Click Corridor tabModify Region panelCopy Region.
  3. In the drawing, select a region to copy.
    Note

    Only valid locations are available for selection. For example, only stations along the current baseline that do not have a corridor region can be selected.

  4. Do one of the following:
    • Specify the region start and end stations.
    • Enter F to fill an entire gap area with the copied region. After entering F, you are prompted to specify the region location.
  5. Press Enter to end the command.

Was this information helpful?