Share
 
 

New Run dialog

This dialog allows users to generate and configure incident runs or response runs.

New Run Dialog

The options available on this dialog are displayed below:

Option

Description

Run Name

Name of the run. IWLive Pro provides an automatically generated name that can be overwritten by the user.

Duration Duration of the simulation in a dd:::hh:mm format.

Warning Template

Drop-down list containing the available warning templates.

Warning templates present in this list are warning templates that have been associated with the baseline.

Water Quality Run

Tick to indicate that the run is a Water Quality Run.

Solute Data

Enabled for Water Quality runs.

Drop-down list containing the available solute data objects.

Solute Data objects present in this list are the ones that have been associated with the baseline. See Water Quality page of the baseline.

Clear initial concentrations

Enabled for Water Quality runs.

Reset the initial concentration of the solute data to zero. This is to be used if the run about to be generated (incident run or response run) is for a different substance to the run it originates from (projection or incident run, respectively).

Trace Node

Enabled for Water Quality runs.

Set a node in the network to be used as a trace node. Source tracing tracks over time the percent of water reaching any node in the network that had its origin at a particular node, called trace node.

Use BalanceNet

Enabled for BalanceNet runs.

This option is available for runs that have been optimised using BalanceNet.

Enable this option to indicate that the incident or response run about to be created is to be optimised using BalanceNet.

OK

Create the run. The Simulate button of the Runs Window needs to be pressed for the simulation to start.

Cancel

Abort run creation and close the dialog.

Was this information helpful?