Share
 
 

Include Project Parameters or Area Schemes from Linked Models in a Schedule

  1. In the linked model, create a schedule that contains a project parameter or area schemes.

    Be sure that the schedule has a unique name (one that is different from any schedules that currently exist in the host project).

  2. Add the schedule to a sheet.
  3. Select the schedule on the sheet, and click Modify | Schedule Graphics tabClipboard panel (Copy to Clipboard).
  4. Open the host project.
  5. If needed, unload the linked model.
  6. In the host project, open a sheet view.
  7. Click Modify tabClipboard panelPaste drop-down (Paste from Clipboard).
  8. If you unloaded the linked model, reload it.

The project parameters or area schemes are now available for scheduling in the host project.

Was this information helpful?