- Category
-
Routed Systems
- Time Required
-
30 minutes
- Tutorial File Used
-
pipe.ipt, 45Elbow.ipt, 90LongElbow.ipt, Accumulator.iam
Objectives
- Author iParts.
- Define connection points and connection axes.
- Set up a new library.
- Publish iParts.
- Set a new style with published parts.
Prerequisites
- Basic knowledge of Tube and Pipe functionality. We recommend that you complete the other Tube and Pipe tutorials first.
- Basic knowledge of Content Center and user libraries.
- Basic knowledge of iParts.
Navigation Tips
- Use Next or Previous at the bottom-left to advance to the next page or return to the previous one.
Next