Undo Check Out

Remove the reservation on the project and disregard any changes made.

To undo a check out, select Undo Check Out from the Vault tab.

Undo Check Out reverts the copy of the project in the Vault database to the previous checked in state. If the Replace local copy check-box is selected, the local copy of the project would also revert to the previous checked in state found in the Vault database.

Note: The Undo Check Out feature is disabled while an analysis is running.