Create a Station Using Material Flow - Reference
Access: | Ribbon: Factory tab > Material Flow panel > Station ![]() |
Select station geometry and specify a station connector. Station geometry can include any drawing geometry and text you want to use. It can also include factory assets.
To create a new station from within the browser, right-click in empty browser space and select Create. A new station node is created and highlighted so you can immediately enter the station name.
The following commands are accessible from the context menu:
Redefine | Removes the geometry from the station. Select the geometry that is to be included in the station. Right-click the background to end the selection process. |
Reposition Connector | Select the new location for the connector. |
Copy | Copies the selected station geometry, properties, and connector. The new station is in the same location as the copy host station. Use the standard Move command to relocate the station. |
Rename | Highlights the station name allowing you to immediately enter a new name. |
Delete | Deletes the selected station. |
Properties | Displays the Factory Object Properties palette with the selected station properties. |
General Properties include:
Property | Description |
Name | Read-only field displaying the station name. |
Identifier | An asset tag value used to identify the station. It can be a corporate asset tag or departmental. |
Factory properties include:
Property | Description |
Setup Cost Rate (/hr) | Assigns the hourly cost for preparing the station resource for use in a manufacturing operation. |
Processing Cost Rate (/hr) | Assigns the hourly cost for running manufacturing operations on the station. |
Uptime Percent | Assigns the amount of time the asset is expected to be in use or available for immediate use. |
Energy Consumption Cost Rate (/hr) | Assigns the hourly cost for energy required to operate the asset. |