Create a service point using the Electric tab. Connect the service point to the transformer you located. Check the connectivity with a workflow.
|
|
If you are connected to the Internet, play the video to see how to create a service point and connect it to a transformer. Check the connectivity with an industry model workflow. You can also click "Let Me Try" to try it yourself. The steps for this procedure are listed below the video. |
To create a service point in an industry model drawing
Enter ends the operation and Escape exits creation mode.
To connect the service point to a transformer
Turn on node-snapping to make sure that the features are connected properly.
Use the split button for Add Underground Conductor to see the types of conductors available.
Display the nodes on the service point to be sure you connect the conductor at the right place.
To check the connectivity using a workflow
. This workflow traces connected features from a starting point that you specify. You can optionally specify a stop point to limit the trace.
Specify where to start the tracing operation.