Pipe connections model the components and construction of an actual piping system. Connectors attach pipe segments to joints, fittings, and MvParts. Separate joints, such as flanges and couplings, reflect actual construction components in schedules. Connector engagement length (CEL) is configured for parts to ensure accurate pipe lengths and joint locations.