To Reselect Objects for a Schedule

Use this procedure to reselect objects to include in a schedule table. After reselection, the table contains only the newly-selected objects.

  1. Select the schedule table.
  2. Click Schedule Table tabScheduled Objects panelReselect.
  3. In the drawing, select the objects to include in the table, and press Enter.