To Copy Corridor Regions

Use this command to copy corridor regions along the same baseline.

  1. In the drawing, click a corridor.
  2. Click Corridor tabModify Region panelCopy Region Find.
  3. In the drawing, select a region to copy.
    Note: Only valid locations are available for selection. For example, only stations along the current baseline that do not have a corridor region can be selected.
  4. Do one of the following:
    • Specify the region start and end stations.
    • Enter F to fill an entire gap area with the copied region. After entering F, you are prompted to specify the region location.
  5. Press Enter to end the command.