About Demolition Plans

Existing construction and those objects categorized as demolished (Demo) display on a demolition plan. All new objects are hidden.

By switching between renovation plan types, you can work in different “views” of the drawing, and avoid errors often incurred when editing multiple drawings. Display settings for the demolition plan type are located in the Renovation Options dialog box. By default, yellow is assigned to demolished objects.

You must first activate Renovation mode before you can work with drawings using Renovation features.

New objects are turned off by default. To display the plan with new objects, click (New Show/Hide).