Drawing Audit Dialog Box

Detects problems related to wires and wire numbers, corrects them, and displays a report.

Find
 Command entry:  AEAUDITDWG
Audit Drawing or Project
Specifies to run the audit on the active drawing or selected drawings in the active project.
Previous
Redisplays the last audit report that was run. You can then surf to the performed function, save the report, or print the report for reference.
Surf
Goes to the error location within the drawing where the error occurred and was fixed.

After you click OK, you can select the type of drawing audit to run. If you selected to audit the project, select the drawings in the active project to audit, and click OK.

Wire Gap Pointers
Looks for problems related to missing wires which were connected through gap pointers.
Bogus Wire Number and Color/Gauge Label Pointers
Looks for and cleans up wires pointing to nonexistent wire numbers (it is the opposite of wire number floaters). Also looks for bad color/gauge label pointers.
Zero Length Wires
Looks for and erases zero length line entities on the wire layer.
Wire Number Floaters
Looks for and erases wire numbers that are not linked to a wire network (for example, the wire was manually erased but wire number remains).
Show Wires (Mark in Red)
Draws an outline around each wire entity.
  • Bright red outline. Regular wires
  • Magenta outline. Wires on layers defined as No Wire Numbering.
Note: This option is available when running on the active drawing only.