Specify whether to run the report across selected drawings from the project, the current drawing, or selected conduit markers.
You can specify to display the last report run from this dialog box instead of running a new report by clicking the Redisplay Last Run button.
Click OK.
Select the drawings or conduit markers to process (depending on whether the report is run across the projector selected markers).
In the Report Generator dialog box, change the report format. You can specify to add the time and date, title line, project lines, column labels, page numbers, and blank spaces between report entities.
(Optional) Click Edit Mode to edit the report.
If the report is formatted correctly, specify to print the report, put it on the drawing, or save the report to a file.
Generate a Conduit Routing Report
You must have at least one conduit marker with wire connections on your drawing in order to run this report.
Specify whether to run the report across selected drawings from the project, the current drawing, or selected conduit markers.
You can specify to display the last report run from this dialog box instead of running a new report by clicking the Redisplay Last Run button.
Click OK.
Select the drawings or conduit markers to process (depending on whether the report is run across the projector selected markers).
In the Report Generator dialog box, change the report format. You can specify to add the time and date, title line, project lines, column labels, page numbers, and blank spaces between report entities.
(Optional) Click Edit Mode to edit the report.
If the report is formatted correctly, specify to print the report, put it on the drawing, or save the report to a file.