To Merge Pressure Networks

Use the Merge Pressure Network command to merge one pressure network into another pressure network.

  1. Select a pipe run in a pressure network. The Pressure Network Plan Layout tab opens.
  2. On the Pressure Network Plan Layout tab, click Modify panel Merge Pressure Networks .

    A selection dialog box is displayed.

  3. Select the pressure network to be merged into another pressure network and click OK.
  4. Select the destination pressure network and click OK.

    The first pressure network is merged into the destination pressure network. Its collection is removed from the Prospector tree and the parts are added to the destination pressure network's collection in the Prospector tree.