Missing data values can be inferred from existing data, allowing gaps in data to be filled with reasonable values.
Inference data is edited on the Inference Data Editor.
The following parameters can be inferred for nodes:
Parameter |
Inferred from |
---|---|
Chamber Floor Depth |
Values are inferred from Depth From Cover values of connected pipes. Node Chamber Floor Depth is inferred as the greatest value found from the following:
|
Coordinates |
Upstream and Downstream node positions and pipe lengths. See Coordinates section below for more details. |
Ground Level |
Node ground levels can be inferred for any node where these values are missing. There are three methods by which ground level can be inferred:
|
Cover Level |
Values inferred from Ground Level at node. Cover Level will be set equal to Ground Level at the node. |
Node coordinates can be inferred for any node where these values are missing. Values are inferred if both x and y coordinates are zero or blank.
No inference is carried out if just one of these values is blank or zero. No inference is carried out if the node is not connected to the network. For node coordinate inference to work efficiently and correctly, you should attempt to sort out any connectivity problems in advance.
Bear in mind when using this option that a location of (0, 0) may be perfectly valid depending on the coordinate system used for your model.
InfoAsset Manager attempts to infer node coordinates for nodes where both x and y coordinates are zero or blank as follows:
Ground Levels are inferred from nodes with ground level values within a user defined Search Radius of the node with a missing ground level.
|
ExampleThe contribution from each node to the ground level of the target node is weighted by the inverse square function of distance from the boundary node. Weight decreases as distance from the target node increases, therefore ground level of nodes closer to the target node will contribute more to the calculated ground level. If a node within the search radius does not have a ground level, it will be ignored during the calculation process. |