Use the Stormwater controls tab to review individual analysis of stormwater basins, such as ponds, in your drainage system.
Object navigation and editing
tool to locate the object and correct any drawing issues such as connections, location, object type, sizes and level.
dialog boxes to update any parameter issues for the object.
OK. The maximum water elevation is below the Freeboard elevation (top of pond elevation minus freeboard depth).
Flood Risk. The maximum elevation is below the top of pond, but within the Freeboard.
Flood. The maximum water elevation is above the top of pond.