Project Administration sets maximum limits on activity logs, handover exports, and locations. Review these limits when you plan a project so you can structure content and workflows within them.
| Tool | Limitations |
| Activity Log | Maximum time period for activities captured in the activity log: 12 months Maximum days of activities exported at once: 31 days Maximum activities contained in a single report: 10,000 |
| Handover | Maximum size of export: 450GB As-built Export Maximum files that can be exported in an as-built: 15,000 Maximum number per data type in Handover or As-built Export: Assets: 10,000 Sheets: 10,000 Submittals: 3,000 Issues: 3,000 Photos
Forms: 15,000 RFIs: 3,000 |
| Locations | Maximum number of location nodes: 9,999 Maximum number of hierarchy depth levels: 20 Maximum links of sub-locations to a single sheet: 499 Maximum number of characters in location title: 255 Maximum number of characters in QR code: 25 (no special characters) Maximum file size of XLS for importing locations: 10MB |