Project Admin Limitations

Project Administration sets maximum limits on activity logs, handover exports, and locations. Review these limits when you plan a project so you can structure content and workflows within them.

Tool Limitations
Activity Log Maximum time period for activities captured in the activity log: 12 months

Maximum days of activities exported at once: 31 days

Maximum activities contained in a single report: 10,000
Handover Maximum size of export: 450GB

As-built Export

Maximum files that can be exported in an as-built: 15,000

Maximum number per data type in Handover or As-built Export:

Assets: 10,000

Sheets: 10,000

Submittals: 3,000

Issues: 3,000

PhotosFiles: 15,000

Forms: 15,000

RFIs: 3,000
Locations Maximum number of location nodes: 9,999

Maximum number of hierarchy depth levels: 20

Maximum links of sub-locations to a single sheet: 499

Maximum number of characters in location title: 255

Maximum number of characters in QR code: 25 (no special characters)

Maximum file size of XLS for importing locations: 10MB