Edit the information in the Configuration Report.
Find
Click Edit Mode.
If you edit the information in the Configuration Report, you have an option to update the project and drawings with the new information. Re-order the lines with the Move Up, Move Down, Move to Top, and Move to Bottom buttons. If you re-order the lines, the order of the drawing list in the project file (.WDP) can be updated to match.
Move Up |
Moves the currently selected lines up one place in the report. |
Move Down |
Moves the currently selected lines down one place in the report. |
Move to Top |
Moves the currently selected lines to the top of the report. |
Move to Bottom |
Moves the currently selected lines to the bottom of the report. |
Edit
Edits the values of the currently selected line. Double-click any line to go directly into edit.
DWGNAM |
Specifies the drawing name. |
SEC |
If you change any of the Sec data, the Section data held in the project file (.WDP) can be updated to match. |
SUBSEC |
If you change any of the SubSec data, the Sub-Section data held in the project file (.WDP) can be updated to match. |
SH |
If you change any of the SH data, the Sheet (%S) field for that drawing can be updated to match. |
SHDWGNAM |
If you change any of the SHDWGNAM data, the Dwg no. (%D) field for that drawing can be updated to match. |
IEC_P |
If you change any of the IEC_P data, the IEC Project (%P) field for that drawing can be updated to match. |
IEC_I |
If you change any of the IEC_I data, the IEC Installation (%I) field for that drawing can be updated to match. |
IEC_L |
If you change any of the IEC_L data, the IEC Location (%L) field for that drawing can be updated to match. |
SH-DESC |
If you change any of the SH-DESC data, the Description data held in the project file (.WDP) can be updated to match. |