Specifies which fields to include in the report, the field order, and the field labels.
FindCommand entry: AEPROJECT
In the Project Manager, right-click the project name and select Drawing List Report. Run the report and click Change Report Format on the Report Generator dialog box.
List of Options
The following options are displayed.
- Available Fields
- Lists the available fields for the report, including fields added with the User Attributes command. Select a field from the list to add it to the report.
- Fields to Report
- Specifies the fields to display in the report, and the field order.
- Remove
- Removes the selected field from the Fields to Report list.
- Remove All
- Removes all the fields from the Fields to Report list.
- Move Up
- Moves the selected field up one spot in the Fields to Report list.
- Move Down
- Moves the selected field down one spot in the Fields to Report list.
- Change Field Name/Justification
- Specifies the field label and justification for the selected field. Note: The vertical justification is used only when the report is inserted as a table.
Available Fields
Note: Additional fields may display if the drawing or project is set up with a title block association.
- FILENAME
- Drawing .dwg file name
- FILEDATE
- Date the drawing was last saved
- FILETIME
- Time the drawing was last saved
- SH
- Sheet value (%S) for the drawing
- SHDWGNAM
- Drawing value (%D) for the drawing
- SEC
- Section value for the drawing
- SUBSEC
- Sub-section value for the drawing
- DWGDESC
- Description 1 value for the drawing
- FULLFILENAME
- Drawing .dwg file name, with full path
- DWGDESC2
- Description 2 value for the drawing
- DWGDESC3
- Description 3 value for the drawing
- IEC_P
- Project code value for the drawing
- IEC_I
- Installation code value for the drawing
- IEC_L
- Location code value for the drawing