Undoes the check out of a collaboration project drawing.
Access Methods
Ribbon: CollaborationUndo Check Out
Command entry: plantundocheckout
Summary
Undoes the check out of a collaboration drawing so that any changes you made to the drawing are abandoned and not checked into the collaboration project.