Share
 
 

FAQ: What is the difference between a locked file and a checked out file?

With the check out functionality you can track the modifications history along with the users who have modified the drawing.

When you open a drawing and make modifications to it, the modifications are saved to the drawing but there is no history recorded and a backup version file is not created.

Was this information helpful?