When you synchronize a project or a project drawing, you can save a synchronization report in HTML or XML format.
You can define in the project setup whether a synchronization report should be generated when synchronizing a project.
- Verify that the creation of synchronization log files has been activated in the project configuration, as described in To Generate a Synchronization Report.
- Synchronize a project or a drawing with its standards, as described in To Synchronize a Project With AEC Standards or To Synchronize a Project Drawing With AEC Standards.
When the synchronization is finished, the Save Project Standards Report dialog box is displayed.
- Select a file location and enter a name for the synchronization report.
- Click Save.
The report is saved as an HTML or XML document in the specified location. You can open it with a Web Browser or an XML editor.
The report offers you various ways to display synchronization results; for example, you can view the synchronization results by drawing, by standard objects, or by problems encountered.