This document lists product fixes included in InfoDrainage 2024.1
| Civil 3D interoperability |
| The issues reported in specific files when exporting from Civil 3D to InfoDrainage using English setup and Italian country kits have been resolved. |
| The issues reported with InfoDrainage PSETs not being retained during the Civil 3D import process have been resolved. |
| The Civil 3D import/export delays experienced by some users when loading the part families have been addressed. The import and mapping processes are now quicker. |
| The import/export error associated with pipes that have no end structures assigned has been resolved. The export process does not crash, but instead, it will be exported with a simple junction in place of the missing structure. |
| The issues associated with maintaining the existing style and data within Civil 3D when performing a full roundtrip with InfoDrainage have been resolved. |
| The memory leakage issues associated with exporting a large Civil 3D model have been resolved. |
| The issues associated with base-flow and input hydrographs losing their connections to the nodes when performing a full roundtrip with Civil 3D have been resolved. |
| General |
| The issue associated with losing backdrops when performing the pipe sizing due to syncing has been resolved. |
| The issue encountered when using the phase management with a dry weather run and a static run has been resolved. |
| The issue reported with the Areal Reduction Factor not being applied to ARR rainfall has been resolved. |
| The 1D/2D analysis error related to a particular minimum element area has been addressed. |
| The issues associated with the use of cumulative rainfall and temporal patterns have been resolved. |
