Share
 
 

Release Notes for InfoDrainage 2024.1

This document lists product fixes included in InfoDrainage 2024.1

Civil 3D interoperability
The issues reported in specific files when exporting from Civil 3D to InfoDrainage using English setup and Italian country kits have been resolved.
The issues reported with InfoDrainage PSETs not being retained during the Civil 3D import process have been resolved.
The Civil 3D import/export delays experienced by some users when loading the part families have been addressed. The import and mapping processes are now quicker.
The import/export error associated with pipes that have no end structures assigned has been resolved. The export process does not crash, but instead, it will be exported with a simple junction in place of the missing structure.
The issues associated with maintaining the existing style and data within Civil 3D when performing a full roundtrip with InfoDrainage have been resolved.
The memory leakage issues associated with exporting a large Civil 3D model have been resolved.
The issues associated with base-flow and input hydrographs losing their connections to the nodes when performing a full roundtrip with Civil 3D have been resolved.
General
The issue associated with losing backdrops when performing the pipe sizing due to syncing has been resolved.
The issue encountered when using the phase management with a dry weather run and a static run has been resolved.
The issue reported with the Areal Reduction Factor not being applied to ARR rainfall has been resolved.
The 1D/2D analysis error related to a particular minimum element area has been addressed.
The issues associated with the use of cumulative rainfall and temporal patterns have been resolved.

Was this information helpful?