To Generate a Project Standards Setup Report

Use this procedure to create an HTML or XML report that lists the project’s standard drawings, and standard styles and display settings, along with their version history.

  1. Verify that the project for which you want to create a standards setup report is set as the current project.
  2. Click Manage tabProject Standards panelSetup Report.
  3. In the Save Setup Report dialog box, select a file name, location, and format for the generated report.
  4. Click Save.

    The report is saved in the specified location and can be displayed with a Web Browser or XML editor.