Use this procedure to synchronize display settings in a project drawing with the project standards.
Note: Display settings should always be synchronized with the latest standard settings. Out-of-synch display settings in a project can cause objects to be displayed inconsistently.
- Open a project drawing.
- Click

.
- In the Display Manager tree, navigate to the display setting you want to synchronize.
You can synchronize the following items:
- display configurations
- display sets
- display representations
- Select the item in the tree, right-click, and select Synchronize with Project Standards.
- In the Synchronize Drawing with Project Standards dialog box, select the items to synchronize.
- Click OK to start the synchronization process.