You can duplicate an existing toolpath. This is useful if you want to make adjustments to your existing toolpath without losing the original calculation.
To duplicate a toolpath:
- Select the toolpath you want to duplicate from the Toolpath tab > Active panel list. The selected toolpath is activated.
- Click Toolpath tab >Active panel > Duplicate to create an exact copy of the active toolpath.
The new toolpath has the same name as the original with an _1 added. So, Roughing becomes Roughing_1. If you take a second copy it will be called Roughing_2, and so on.