Version control
|
Options for the version control functionality.
|
Validate network
|
Allows checking of the network for missing values, errors and inconsistencies. See
Validating Networks Validation for details.
Availability: Whenever there is a currently active network.
Toolbar: Operations
Keyboard Shortcut:
Alt+N, A
|
Compare
|
Enables comparison of a network with a number of other networks. See
Comparing Networks for more details.
Availability: Whenever a GeoPlan or network Grid View is the currently active window.
Toolbar: None
Keyboard Shortcut:
Alt+N, C
|
Results
|
Contains submenu items allowing control of simulation replay.
Menu Item
|
Description
|
Rewind
|
Jump to the start of the simulation. If a replay is running it will continue from the start of the simulation
Toolbar: Replay
Keyboard Shortcut:
Alt+N, R, R
|
Backstep
|
Step back in time through the simulation
Toolbar: Replay
Keyboard Shortcut:
Alt+F5
|
Pause
|
Pause the replay.
Toolbar: Replay
Keyboard Shortcut:
Alt+N, R, A or
Alt+F6
|
Single step
|
Step forward in time through the simulation
Toolbar: Replay
Keyboard Shortcut:
Alt+N, R, S or
Alt+F7
|
Play
|
Play a replay of the results of the simulation.
Toolbar: Replay
Keyboard Shortcut:
Alt+N, R, P or
Alt+F8
|
Record
|
Start the process of recording a simulation replay as an AVI video file.
See
Recording a Replay as an AVI File for more information.
Toolbar: Replay
Keyboard Shortcut:
Alt+N, R, E or
Alt+F9
|
Loop
|
Play a replay of the simulation results in continuous repeat mode.
Toolbar: Replay
Keyboard Shortcut:
Alt+N, R, L
|
Fast forward
|
Jump to the end of the simulation
Toolbar: Replay
Keyboard Shortcut:
Alt+N, R, F
|
Replay options
|
Used to set replay options for simulation results.
Toolbar: Replay
Keyboard Shortcut:
Alt+N, R, O
|
Clear results
|
Clear the results currently displayed
Toolbar: Replay
Keyboard Shortcut:
Alt+N, R, C
|
Availability: Whenever a simulation or simulation grid view is the currently active window.
|
Import
|
Contains the following submenu items:
Menu Item
|
Description
|
Open Data Import Centre
|
Enables import of network/control data from external data sources. See
Open Data Import Centre for more details.
Availability: Whenever a GeoPlan Window of a checked out network is the currently active window.
Toolbar: None
Keyboard Shortcut: None
|
From AutoCAD DWG
|
Enables import of network objects from AutoCAD DWG files. See
Importing from AutoCAD DWG for more details.
Availability: Whenever a GeoPlan or Grid View of a checked out network is the currently active window.
Toolbar: None
Keyboard Shortcut: None
|
|
Update
|
Contains the following submenu items:
Menu Item
|
Description
|
From calibration simulation/file
|
Enables update of link Roughness values from a Calibration run or from a CSV file. See
Updating the Network from Calibration Results for details.
Availability: Whenever a GeoPlan or network Grid View of a checked out network is the currently active window.
Toolbar: None
Keyboard Shortcut: None
|
Nominal pressures
|
Enables update of node Nominal Pressure values from simulation results. See
Updating Nominal Pressures for details.
Availability: Whenever a GeoPlan or network Grid View of a checked out network is the currently active window.
Toolbar: None
Keyboard Shortcut:
Alt+N, N
|
Initial concentrations
|
Enables update of node Initial Concentration values from simulation results. See
Updating Initial Concentrations/Turbidities from Results for more information.
Availability: Whenever a checked out Control is associated with the currently active network.
Toolbar: None
Keyboard Shortcut:
Alt+N, I
|
Initial turbidities
|
Enables update of node Initial Turbidity values from simulation results. See
Updating Initial Concentrations/Turbidities from Results for more information.
Availability: Whenever a checked out Control is associated with the currently active network.
Toolbar: None
Keyboard Shortcut:
Alt+N, N
|
Initial shear strengths from maximum shear
|
~
|
Criticality
|
Enables update of link Criticality values from a set of Critical Link Analysis simulation results. See
Updating Link Criticality from CLA Results for details.
Availability: Whenever a checked out network view is the currently active window.
Toolbar: None
Keyboard Shortcut:
Alt+N, C
|
From CSV files
|
Enables import and update of network data from CSV files. See
Updating from CSV Data for more details.
Availability: Whenever a GeoPlan or Grid view of a checked out network is the currently active window.
Toolbar: None
Keyboard Shortcut:
Alt+N, S
|
From InfoAsset snapshot
|
Enables update of network data from an InfoAsset snapshot file. See Updating from InfoAsset data for more information.
Availability: Whenever a GeoPlan or Grid view of a checked out network is the currently active window.
Toolbar: None
Keyboard Shortcut:
Alt+N, F
|
|
Export
|
Contains the following submenu items:
Menu Item
|
Description
|
Open Data Export Centre
|
Enables export of network/control data to external data sources. See
Open Data Export Centre for more details.
Availability: Whenever a network is the currently active window.
Toolbar: None
Keyboard Shortcut: None
|
|
Network
|
Contains the following submenu items:
Menu Item
|
Description
|
List all hyperlinks
|
Displays a list of all hyperlinks attached to objects in the currently active network. The list can be used to access the hyperlinked information.
Availability: Whenever a network view is the currently active window.
Toolbar: None
Keyboard Shortcut: None
|
Clear ground model
|
Clear the Ground Model loaded onto the current GeoPlan Window. No changes will be made to the Ground Model itself. See
Loading a Ground Model on the GeoPlan for more details.
Availability: Whenever a Ground Model is loaded onto the current GeoPlan Window.
Toolbar: None
Keyboard Shortcut: None
|
Name Generation
|
Used to set options for automatic generation of Node IDs based on coordinates or on a user defined pattern.
Availability: Whenever a GeoPlan Window is the currently active window.
Toolbar: None
Keyboard Shortcut: None
|
Overview
|
Displays a summary of the objects in the network and some additional information about selected parameters. See
Network Summary for more details.
Availability: Whenever a network view is the currently active window.
Toolbar: None
Keyboard Shortcut: None
|
|
Alternative Demand
|
Contains the following submenu items:
Menu Item
|
Description
|
Initialise alternative demand
|
Copies Node and Customer Point demand data from the current network to an associated Alternative Demand. See
Initialising Alternative Demand for more information.
Availability: Whenever a checked out Alternative Demand is associated with the current network in the GeoPlan Window.
Toolbar: None
Keyboard Shortcut: None
|
Update alternative demand
|
Updates the alternative demand from CSV files, or by using the
Open Data Import Centre. See
Updating Alternative Demand for more information.
|
Copy alternative demand to network
|
Copies Node and Customer Point demand data from an associated Alternative Demand to the current network. See
Copying Alternative Demands to the Network for more information.
Availability: Whenever an Alternative Demand is associated with a current checked out network in the GeoPlan Window.
Toolbar: None
Keyboard Shortcut: None
|
|
Control
|
Contains the following submenu items:
Menu Item
|
Description
|
Control time interval
|
Allows viewing and editing of Simulation Start and End Times and the Timestep of a Control Data Set.
Availability: When there is a Control associated with the currently active network.
Toolbar: None
Keyboard Shortcut:
Alt+N, T
|
Update controls from live data
|
Allows the update of time varying control data automatically from Live Data linked to the model. See
Updating Control Data from Live Data Links for details.
Availability: When there is a Control associated with the currently active network.
Toolbar: None
Keyboard Shortcut:
Alt+N, U
|
Link live data points
|
Allows automatic linking of Live Data to the model by matching Live Data Point ID to network object Asset ID or Object ID. See
Linking Live Data to the Model for details.
Availability: When a checked out network is associated with the currently active network, and a Live Data Configuration is open.
Toolbar: None
Keyboard Shortcut: None
|
Global UPC script
|
Allows viewing and editing of the Global UPC Script in a Control Data set. See
UPC Scripts for more information.
Availability: Whenever the current window is a GeoPlan Window with an associated Control.
Toolbar: None
Keyboard Shortcut:
Alt+N, U
|
Control data overview
|
Displays a summary of all of the control objects in the network. See
Displaying a Control Data Summary for more details.
Availability: Whenever the current window is a GeoPlan Window with an associated Control.
Toolbar: None
Keyboard Shortcut:
Alt+N, O
|
Control data exceptions
|
Displays a list of control data that is not associated with any of the objects in the current network. See
Dealing with Orphan Control Data for more details.
Availability: Whenever the current window is a GeoPlan Window with an associated Control.
Toolbar: None
Keyboard Shortcut:
Alt+N, E
|
Clear control
|
Clear the Control Data associated with the current Network from the GeoPlan Window. No changes will be made to the Control Data itself. See
Associating Control Data with a Network for more details.
Availability: Whenever the current window is a GeoPlan Window with an associated Control.
Toolbar: None
Keyboard Shortcut: None
|
|
Run add-on
|
Lists
add-ons that can be run (if any).
|
Run Ruby script
|
Opens a window for selecting a Ruby script to run.
|
Recent scripts
|
Lists recently accessed scripts (if any).
|