Share

Quickstart Pack analysis: Tutorial review

In this tutorial, you:

  • Created a project
  • Imported an existing study
  • Duplicated the part
  • Set the parting plane location
  • Created the mold
  • Created the runner system
  • Set the analysis parameters and ran the analysis
  • Reviewed results

Be Adventurous

The results are less than ideal. The sprue is controlling the cycle time and the volumetric shrinkage should have a lower variation.

Try to reduce the cooling time by reducing the sprue diameter.

  • Save the study with a different name.

  • Select the sprue.

  • Right click and select Properties.

  • Change the diameter and click OK.

  • Run another analysis and compare results.

    The fill pressure is acceptable when under 100 MPa.

Try to reduce the variation in volumetric shrinkage.

  • Save the study with a different name.

  • Go to the Advanced tab of the Process settings wizard and make a change to the packing profile.

  • Run another analysis and compare results.

    The variation in shrinkage across the nominal wall is preferably less than 2%.

Was this information helpful?